Clarion M10 Series Bedienungsanleitung Seite 21

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 21
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 20
C-SPEC CORPORATION WIRELESS PRODUCTS
CLARION MerLAN M10 19
UPGRADE PROCEDURE
The upgrade procedure requires that the MerLAN M10 unit be connected
directly to the NIC on the PC via an AUI cable, or 10BaseT cable with an AUI
to 10BaseT media converter which crosses the send and receive data signals,
or thru a hub. Perform the following steps to upgrade the MerLAN M10.
1. Connect the Clarion Power Supply to the M10. Wait for the blinking of
the red TX LED to stop before trying to run the upgrade program.
2. Type UPGRADE <xxxxxx> where <xxxxxx> is the last six digits of the
serial number of the M10 unit which is written on the label attached to
the bottom of the unit or is the Clarion NULL address of six zeroes. The
first six digits are always 00606F. If the unit is configured to use the
Clarion NULL address, then type UPGRADE 000000 . If the unit is not
configured to use the NULL address and if the serial number is
00606F040417, then type UPGRADE 040147. You will see the following
messages displayed:
**********************
*
* M10 Uploader v2.7
*
**********************
Initializing IPX...
Canceling pending events...
Getting network address...
Setting target address...
Getting local node...
Uploading...
Frame: 24/24, 024840 bytes...
NOTE: The frame number begins at 01/24 and increases up to 24/24 during
which the red TX LED begins blinking twice at approximately 2 second
intervals. The completion of the firmware transmission is indicated by the
red TX LED remaining on and the following messages being displayed.
Transfer complete
Wait for boot LED or AUI boot message (apox. 4 mins)
Hit any key to exit.
04:17
At this time, the MerLAN M10 starts burning the EEPROM and the red TX
LED remains on and blinks approximately every 20 seconds. The AUI cable
may be disconnected at this time to be used to connect another M10 for
upgrade purposes but the power cable must remain connected throughout the
burning process which takes approximately 4.5 minutes after which the red
TX LED goes off.
Seitenansicht 20
1 2 ... 16 17 18 19 20 21

Kommentare zu diesen Handbüchern

Keine Kommentare